My Sourcing

LanguageEnglish

Please enter a valid keyword with 2 or more characters / numbers.

Shenzhen Grande Electronic Co Ltd
Enquire
Shenzhen Grande Electronic Co Ltd

Shenzhen Grande Electronic Co Ltd

Guangdong, Mainland China

Manufacturer

Average Response Time

N/A

Disclaimer

Some links on this website may take you to other third-party sites and you acknowledge and agree that HKTDC and the HKTDC Affiliates have no responsibility for the accuracy or availability of any information provided by those linked websites.

Links to other websites do not constitute an endorsement by HKTDC of such websites or the Information, products, advertising, or other materials available on those websites.

Share this page
Printing Machine Grande PCB Assembly | One-Stop PCB Solutions Supplier
Share this page
Production Lead Time:
14 day(s)
Model No.:
GT-PCBA-1
Brand:
Greattong
Port:
Shenzhen FOB
Type of Payment:
T/T
Minimum Order Quantity:
1 piece
Package:
Yes
Description
Contact Supplier
Description
Supplier: Shenzhen Grande Electronics
Layers:4
Application: Printing Machine Grande PCB Assembly | One-Stop PCB Solutions Supplier
PCB:FR4/1.6mm/2oz
Min Via: 0.2mm
Surface Treatment: HASL
PCBA Lead time: 3-4 weeks
Testing: 100% E-test
Standard Warp:<0.75%


[Description]
1, Turnkey solution for Printing Machine Grande PCB Assembly | One-Stop PCB Solutions Supplier.
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3,  Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Shenzhen Grande Electronic Co Ltd

Shenzhen Grande Electronic Co Ltd

Guangdong, Mainland China

Manufacturer

Average Response Time

N/A

You may also like

Unfollow the following supplier?