Ride On Motorbike | 骑乘玩具 | 儿童自行车及三轮车
中国内地
展位编号: 5G-G25 | 展团 |
产品规格
主要材料

塑料

适用年龄

3-7 Years

是否可定制

产品型号

PB378

品牌名称

FENGSU

最低订购数量

50

付款方式

30% Deposit

港口

Shanghai

颜色

Red, Black, Yellow

尺寸

113 x 54 x 75cm

产品简介
Pamper your kids with this stylish ride-on motorbike. It sports a three-wheeled construction coming in a vibrant color for a cheerful vibe. Built with environmental-friendly material, this ride-on motorbike adds outdoor fun to your children’s adventures.
 
Feature:
  • Sport a three-wheeled construction.
  • Vibrant color for a cheerful vibe.
  • With headlights for added realness.
  • Fitted with music on the dashboard.
  • MP3 connector to play your favorite music.
  • High-functioning electric brake for driving safety.
  • Environmental protection materials.
  • Excellent workmanship for reliable performance.
  • Can move forward and backward.
  • Add outdoor fun to your children’s adventures.
  • Packed in an export brown carton, yet color box can be provided if required.
  • Come in different vibrant colors for added style.
  • Designed for children aged 3-7.
  • Speed: 2.5 km/hr.
Other information:
  • Packing: 1 pc/ctn.
  • Packing size: 78 x 50 x 43cm.
  • Product size: 113 x 54 x 75cm.
  • Gross weight/ net weight: 12.5/10.5kg.
  • Max. capacity: 25kg.
  • Delivery time: 30-35 days after receiving the deposit.
  • Payment: T/T.
  • MOQ: 1 x 40HQ.
  • Package: as buyer's requirement.
  • Loading port: Shanghai.
  • Item no: PB378.
FAQ:
  • Q1: Can I have a sample order?
  • A: Yes, we welcome sample order to test and check product quality.
  • Q2: What is the lead time?
  • A: Samples need 3-5 working days for delivery. The lead time of mass products depend on shipment means, it needs 3-5 working days by air, and about 1 month by sea.
  • Q3: How do you ship the goods and how long does it take to arrive?
  • A: We usually ship by DHL, UPS, FedEx or TNT, by sea or by air.
  • Q4: Are you a factory or trading company?
  • A: We are a factory. We also provide OEM services to produce products as customers’ requirements.
生产所需时间

10 - 15