Toy Jeep Vehicle | 騎乘玩具 | 兒童電動車
中國內地
展位編號: 5G-G25 | 展團 |
產品規格
產品型號

PB801

品牌名稱

FENGSU

最低訂購數量

50

付款方式

30% Deposit

港口

Shanghai

顏色

Red, Black, Yellow, Green

尺寸

119 x 75 x 74cm

主要材料

塑膠

適用年齡

3-7 Years

是否可訂造

產品簡介
  • Magnificent powered jeep toy riding vehicle with 2 seats.
  • Chic color palette coming in black and red tones.
  • Serrated tires increasing the frictional engagement of the tire and the floor.
  • Sophisticatedly designed control panel.
  • Feature an array of lamps behind the seats.
  • Powerful headlights with a flashing function.
  • Have music on the dashboard and an MP3 connector.
  • Can move forward and backward for easy manipulation.
  • Equipped with an electric brake for a safe sudden stop.
  • Speed: 3km/hr.
  • Suitable for kids aged 3-7 years.
  • Innovative toy vehicle design making it a very popular kids riding car in the Europe market.
  • Basically packed in an export brown carton, yet color box can be provided if required.
  • Sturdy and durable construction that endures vigorous play.
  • Brighten up the days of your kids with this tough toy jeep perfect for adventure.

Other information:
  • Item no.: PB801.
  • Packing: 1 pc/ctn.
  • Packing size: 116x62x38cm.
  • Product size: 119x75x74cm.
  • G.W./N.W: 20.5/17.5kgs.
  • Max. capacity: 30kgs.
  • Delivery time: 30-35 days after receiving the deposit.
  • Payment: T/T.
  • MOQ: 1 x 40HQ.
  • Package: as buyer's requirement.
  • Loading port: Shanghai.

FAQ:
  • Q1: Can I have a sample order?
  • A: Yes, we welcome sample order to test and check product quality.
  • Q2: What is the lead time?
  • A: Samples need 3-5 working days for delivery. The lead time of mass products depend on shipment means, it needs 3-5 working days by air, and about 1 month by sea.
  • Q3: How do you ship the goods and how long does it take to arrive?
  • A: We usually ship by DHL, UPS, FedEx or TNT, by sea or by air.
  • Q4: Are you factory or trading company?
  • We are a factory. We also provide OEM services to produce products as customers’ requirements.
生產所需時間

10 - 15