Premium Maternity Radiation-Protection EMF Shielding Blanket ​​50"x60" Organic Cotton Crepe Sherpa Fleece Throw Blanket | 纺织品、布料及纱线 | 家居布料
Premium Maternity Radiation-Protection EMF Shielding Blanket ​​50"x60" Organic Cotton Crepe Sherpa Fleece Throw Blanket
中国内地
|
生产线所在地:中国内地
展位编号: 3F-C16 | 内衣、家居服、童装 |
产品规格
图案

Custom

Size

50"x 60"

材料

organic cotton/polyester/Silver Fiber

是否可订造

可以

产品简介

Triple-Layer Protection Technology

🛡️ 1st Layer (Top):

  • 100% GOTS organic cotton crepe (200+ stock colors)
  • Combed long-staple yarn with pilling-resistant finish
  • GOTS-certified natural dyes (OEKO-TEX Class I)

2nd Layer (Shield):

  • Silver fiber woven fabric (tested 99.9% EMF attenuation)
  • Medical-grade radiation protection (blocks 30-50dB of RF/EMF)
  • Machine washable without efficacy loss

🧶 3rd Layer (Base):

  • Premium sherpa fleece 
  • Ultra-plush thermal regulation
  • Hypoallergenic & moisture-wicking

Product Specifications

Size: 50"×60" (127×152cm) generous coverage
Edging: 10mm satin binding with reinforced corners
Safety:

  • FCC-certified radiation protection
  • EN71-3, CPSIA, ASTM F963 compliant
  • 50+ wash cycle durability guarantee

Customization Options

🎨 Color Selection:

  • 200+ organic cotton crepe colors (low MOQ for stock colors)
  • Custom dyeing with our GOTS certified baby-safe natural ink

🏷️ Branding:

  • Custom woven labels (cotton/satin)
  • Retail-ready packaging solutions

Production Timeline

Sampling: 7-14 days
Bulk Production: 25-35 days after approval
📦 MOQ: 200 pieces


Why Partner With Us?

✅ 20 Years Specialized in Maternity Textiles
✅ Medical-Grade Radiation Protection
✅ Small Batch Custom Dyeing

Request Our:

  • Radiation test video demonstration
  • Fabric technology white paper
  • Private label design template

Certifications: [GOTS] [FCC] [OEKO-TEX] [SGS]

Premium Features:

  1. Triple-Layer Patent Pending Construction
  2. Hospital-Grade Silver Fiber Weave
  3. 200+ Color Options with Instant Sampling

Engineered for Modern Mothers - Your Trusted OEM Since 2005


生产所需时间

30