960P 24 Pin DVP Interface MIPI Camera Module | Consumer Electronics | Internet of Things | Parts, Components & Electrical Supplies | Security & Surveillance | Security & Surveillances
960P 24 Pin DVP Interface MIPI Camera Module
Chinese Mainland
Booth: 1B-F25, 1CON-S062 | Hall of Fame - Gadgets World, HKTDC Buyer Centre - hktdc.com Showcase Zone | Cantonese Business Go Global
Product Specification
Resolution

1.3MP

Module Size

38.50 x 12.50 mm

Model Number

HAMPO-M9K-MT9M114 V5.1

Interface

MIPI

View Angle

75°(DFOV)

Focusing

FF

Image Sensor

MT9M114

Product Description
Product Description
HAMPO-M9K-MT9M114 V5.1 is a 1.3MP OnSemi MT9M114 DVP Parallel Interface Fixed Focus Camera Module.It uses 0.5mm and 1mm Pitch Connectors For FPC/FFC.
APPLICATIONS :Notebook computers, printers, PDAs, digital cameras and other compact devices for interconnecting the main circuit board with the LCD, HDD or other device.


Specification
 Camera Module No.
HAMPO-M9K-MT9M114 V5.1
Resolution
1.3MP
Image Sensor
MT9M114
Sensor Size
1/6"
Pixel Size
1.9 um x 1.9 um
EFL
2.00 mm
F/No.
2.40
Pixel
1296 x 976
View Angle
75.0°(DFOV) 60.0°(HFOV) 47.0°(VFOV)
Lens Dimensions
6.00 x 6.00 x 3.54 mm
Module Size
38.50 x 12.50 mm
Focusing
Fixed Focus
Interface
DVP Parallel
Auto Focus VCM Driver IC
None
 Lens Type
650nm IR Cut
Operating Temperature
-30°C to +70°C

Key Features

Superior Low-light Performance

* Ultra-low Power

* 720p HD Video at 30 fps


Company Profile 
Dongguan Hampo Electronic Technology Co,. Ltd is a manufacturing company based in Dongguan, Guangdong, China. We design, develop and manufacture Serial USB cameras modules, MIPI camera modules and DVP modules, finished cameras, other specialty cameras, OID device includes talking pen and smartpen.  
In addition, Hampo offers OEM/ODM services, as well as PCB manufacturing services, to help better serve our client's specific needs.   
Hampo is proud to be a part of this growing field. We invite all innovators, for large or small projects, to allow us the opportunity to be a part of their journey. 
Production Lead Time

7 days