LED Color Tube for Meat GRB Red | Lights | Light Bulbs & Tubes
LED Color Tube for Meat GRB Red
Hong Kong
|
Factory in Mainland China
Booth: 1E-A20 | Hall of Aurora |
Product Specification
Model No.

L05G-R

Brand

ERVAN

Minimum Order Quantity

100 piece(s)

Type of Payment

T/T

Port

Shenzhen

Colour

3000K~7000K

Size

600MM 1200MM 1500MM 1800MM

Voltage(V)

AC100~277V

Certification

CE, EMC, LVD, RoHS

Wattage(W)

20W

Warranty

3 year

Base Type

G13

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

No

Power Source

AC

Customized

Yes

Product Description
Features:
  • Show the best result with pink color for meat displays
  • Patened 180 Deg rotating end cap design for the best lighting result
  • ​Single end power anti electric shock ensures safety
  • Maximum efficacy and minimum glare
  • Attractive design with color ring.
  • Isolating driver inside
  • high energy saving, >60% reduce building carbon footprint, up to 5times longer life with no replacements reducing maintenance costs.quick pay back.
  • life span:50000 hours average operating life.
  • warranty:3years
Specification:
  • Luminous: 2300lm ± 10%(frosted cover)
  • Luminous efficiency: 115lm/W.
  • Light source: SMD3528LED. 
  • LED number: 216pcs
  • Power efficiency: ≥0.92.
  • Power energy saving: ≥80%.
  • Power factor: ≥0.95.
  • THD:<20%
  • CRI: ≥80.
  • Color temperature:pink
  • Input voltage: AC 100 to 277V.
  • Operating frequency: 50 or 60Hz.
  • Beam angle: 120°.
  • PC lens: clear&frosted available.
Application:
  • offices, exhibition hall,residence, library, hospital, school, shopping malls, railway stations, airports, factories, etc.
  • ideal for the replacement of fluorometer.
Certification: TUV, CE,SAA,Rosh

Temperature and Humidity:
  • Operating temperature:-20~+40℃
  • Storage temperature:-40~+85℃
  • Operating humidity:10%-80%
  • Storage humidity:10%-80%
Package:
  • Net weight:0.6kg.
  • Dimension: 26x1198mm
  • Packaging: 1pc/box, 5pcs/ctn.
  • Carton measurement: 1320*340*220mm.
Installation:
  • easy installation when replace the fluorometer with the ervan fuse
  • single anti power,insure safety
Payment: L/C, T/T.

Delivery:
10 days for sample
20 days for mass production.
Production Lead Time

15 days