Motion Sensor LED Tube | Lights
Motion Sensor LED Tube
Hong Kong
|
Factory in Mainland China
Booth: 1E-A20 | Hall of Aurora |
Product Specification
Model No.

L05G-MS

Brand

ERVAN

Minimum Order Quantity

50 piece(s)

Type of Payment

T/T

Port

Shenzhen

Colour

3000K~7000K

Size

600MM 1200MM 1500MM 1800MM

Voltage(V)

AC100~277V

Certification

CE, EMC, FCC, LVD, UL, VDE

Wattage(W)

24W

Warranty

5 year

Base Type

G13

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

Yes

Power Source

AC

Customized

Yes

Product Description
Advantage:
  • Energy-efficient with Motion Sensor
  • 3or 2 steps dimming control
  • Stable detection sensitivity
  • Mounting height 2.5-10m for widely used
  • Wider detection area 25m Max
  • Isolated power supply,Europe safety wired.
  • Latest lockable rotating end cap (patent).
  • Aluminum PCB better heat dissipation
  • single end power anti electric shock ensure safety
  • Maximum efficacy and minimum glare
  • No UV,NO lead, NO Mercury
  • High-tech optical design.
specification:
  • Detection area: R(6-8)m
  • Detection angle:30-150
  • Mounting height:2.5-10m for widely used
  • Detection wide: 25m Max
  • Luminous: 2760lm ± 10%.
  • Luminous efficiency: 115lm/W.
  • Light source: SMD 3528/2835LED. 
  • LED number: 247pcs
  • Power efficiency: 0.92.
  • Power energy saving: ≥80%.
  • Power factor: ≥0.95.
  • THD:<20%
  • CRI: ≥80.
  • Color temperature: 2700-3500K; 4000-4500K ; 5000-6000K ; 7000-8000K 
  • Input voltage: AC 100 to 240V.
  • Input current: 58mA.
  • Operating frequency: 50 or 60Hz.
  • Beam angle: 120°.
  • PC lens: transparent/frosted available.
  • Life span: 50,000 hours.
  • Warranty:5years
Application:
  • Porch, offices, shopping malls, railway stations, parking lot, airports, factories, etc.
Certification: TUV, UL,VDE, DLC
Temperature and Humidity:
  • Operating temperature:-20~+40℃
  • Storage temperature:-40~+85℃
  • Operating humidity:10%-80%
  • Storage humidity:10%-80%
Package:
  • Net weight: 368.2g.
  • Dimension: Φ26 x 1198 (5ft).
  • Packaging: 1pc/box, 50pcs/ctn.
  • Carton measurement: 165 x 48 x 26cm.
  • Pallet:14cartons/pallet
Payment: L/C, T/T.
Delivery:
  • 10 days for sample
  • 20 days for mass production.
Attention:
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • Electronic ballast must be by-passed by a registered electrician.
Production Lead Time

15 days