LED 3/5/7/9/12/15/18W Recessed Ceiling Light Downlight or Spot Lamp ir 85-265V LED Downlight | Lights | Indoor Lighting
LED 3/5/7/9/12/15/18W Recessed Ceiling Light Downlight or Spot Lamp ir 85-265V LED Downlight
Hong Kong
|
Factory in Mainland China
Booth: 1E-A20 | Hall of Aurora |
Product Specification
Model No.

R01CO

Brand

ERVAN

Minimum Order Quantity

5 piece(s)

Type of Payment

T/T, L/C

Port

Shenzhen

Colour

3000K~7000K

Size

R145,R180,R240,R300

Voltage(V)

AC100~277V

Certification

CE, EMC, FCC, LVD, SAA

Wattage(W)

15W

Warranty

5 year

Light Source

SMD2835

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

No

Power Source

AC

Including Bulbs

No

Customized

Yes

Product Description

Description:
  • 100% Brand New & High Quality!
  • High Power, energy saving compared to traditional halogen lamps!
  • Environmental protection and energy saving>80%.
  • Shockproof and damp proof, vibration and corrosion resistance
  • Environmentally friendly and recyclable.
  • optical PMMA light guide
  • AL6063-T5 Aluminium frame material: good dissipateion.
  • Wide application range
  • Safe power interface, easy to install and dismantle with clip.
  • More than 50,000hours average operating life.
specification:
  • Luminous:1275lm ± 10%.
  • Luminous efficiency: 85lm/W.
  • Light source: SMD2835LED. 
  • Power efficiency: ≥0.92.
  • Power energy saving: ≥80%.
  • Power factor: ≥0.95.
  • THD:<20%
  • CRI: ≥80.
  •  
Certification: TUV, CE,SAA

Temperature and Humidity:
  • Operating temperature:-20~+40℃
  • Storage temperature:-40~+85℃
  • Operating humidity:10%-80%
  • Storage humidity:10%-80%
Package:
  • Net weight:0.8g.
  • Dimension: r180
  • Packaging: 1pc/box, 10pcs/ctn.
Installation:
  • Built-in the wall(standard installation)
Payment: L/C, T/T.
Package:
  • 7 days for sample
  • 20 days for mass production.
Attention:
  • FYI: when LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • FYI: electronic ballast must be by-passed by a registered electrician.
Production Lead Time

10 days