LED Ceiling Lamp | Lights | Indoor Lighting
Mainland China
|
Factory in Mainland China
Booth: 3B-C02 | Residential Lighting |
Product Specification
Model No.

MX2711

Brand

YONGJUNLI

Light Source

LED

Is Dimmable

No

Material

Aluminum+ Silicone

Lighting Style

Modern

Including Bulbs

Yes

Product Description

This LED ceiling lamp presents a modern and stylish lighting solution, designed to deliver superior illumination while enhancing the aesthetic appeal of any space. With its high-brightness LED and robust aluminum construction, it combines efficiency and durability with a sleek, contemporary design. Suitable for various indoor areas such as offices, restaurants, canteen, bedrooms, etc.

Packaging & Delivery
Packaging Details
The packaging is standard express carton.(form, carton)
Lead Time :
Quantity(Pieces)1 - 100>100
Est. Time(days)20To be negotiated


Product Description
ModelMD2711/400MD2711/500
Product CategoryLED Ceiling
BrandYONGJUNLI / OEM / ODM
Light SourceLED
Power25W31W
Color Temperature4200K
Product Size(mm)DIA400*H60mm
DIA500*H60mm
Metal Colorwhite / black
Glass colorwhite Silicone 
MOQ20
ApplicationOffice, School, Home,Meeting Room, Show room
FAQ

 Questions And Answers
 Q1 : Are you a manufacturer or trading company? A:We are professional manufacturer of led Chandelier,Ceiling lights,Pendant lamps and Wall lamps in Zhongshan City,China 
 Q2 : What are your maln products? A:Modern Lamp, Crystal Lamp, Pendant Lamp, Wall Lamp 
 Q3 : Can I get some samples? A:We are honored to offer you samples, but sample charge is required 
 Q4 : What ls your payment terms? A:30% deposit, 70% balance pay before shipment  
Q5 : Do you provide OEM and ODM product? A:Yes, we do, both ODM or OEM are welcome 
 Q6 : What is average lead time? A:Sample usually takes about 10-15days depending on product type. Bulk order usually takes about 35 days  
Q7 : Where ls your factory located? Can I visit there? A:Our factory located in China Lighting Capital-Guzhen Town, Zhongshan City-All our clients from home or abroad,are warmly welcome to visit us! 

Production Lead Time

20 days