Plaster board/drywall recessed LED lighting
W011
Surmountor
AC Power
Is Alloy
1M/2M per pcs
Heatsink
6063 Anodized Aluminum
LED Lighting
G24
Clear / Frosted / Milky
Yes
LED
310g
Material: | Anodized Aluminum Extrusion |
Dimension: | 54(W)*15(H)mm |
Match Flexible LED Strips: | Up to 14mm width |
Length: | 1meter, 2 meter or customized length |
PC Cover: | Clear/Frosted/Milky |
UL flammability of PC cover: | UL94V-2 |
Accessories: | Plastic Endcaps |
Application: | Plasterboard or drywall recessed lighting, etc. |
Size:
Service Environment and Installation:
1, Install W011 profile into brick with screws.
2, Lay the mud sand on the W011 wings.
3, Apply lime on the mud sand, keeping it the same level with LED profile PC cover.
4, Turn on the light.
Multiple Connectors are available:
Package:
OPE/OPP bag + Protective materials + Carton (+ Optional Protectors):
1M per pcs, carton: 107*20*16cm
2M per pcs, carton: 207*20*16cm
Surmountor - A company you can trust!
Our company has specialized in LED for 11 years, with 9 engineers and over 100 employees.
We focus on developing LED flexible strips, LED sensor switches, LED Aluminum profiles for strips and LED Linear Lights.
With advanced automatic machines, experienced engineers and sales team, we keep providing high quality products, professional solutions, OEM and ODM as well as considerate aftersale services for our customers.
Q1: Can I have samples to test?
A: Yes, we're pleased to offer samples to check quality. Mixed sample order is available.
Q2: Is there any MOQ for the S002 stair aluminum profile?
A: MOQ is 100 meters.
Q3: What’s the lead time?
A: Sample: 3-5 working days. Mass production: 7-10 working days.
Q4: How do you ship the goods and how long does it take?
A: DHL, UPS, FedEx, TNT. Usually it takes 3-5 days to arrive.
By sea, shipping time is about 30-40 days.
Q5: Do you have you own factory?
A: Yes, we do have our own factory in Shenzhen. Welcome to visit. For 10 years, our company has specialized in LED profiles, LED strips, LED sensor switches, cabinet lights, LED RGB controllers and dimmers.
7-10 days