Hot New Product for 2015 LED Tube T8 | 燈飾 | 燈泡和燈管
Hot New Product for 2015 LED Tube T8
香港
|
生產線所在地:中國內地
展位編號: 1E-A20 | 名燈薈萃廊 |
產品規格
產品型號

L05G

品牌名稱

ERVAN

最低訂購數量

100 piece(s)

付款方式

Western Union, L/C, T/T

港口

Shenzhen

顏色

White

尺寸

26 x 1198mm

電壓(伏)

AC100~277V

證書

歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證

功率(瓦)

20W

保養期

5 年

底座類型

G13

主體物料

鋁, 鋁

可調亮度

不可以

包含燈泡

不包含

可定制

產品簡介

Feature:
  • More energy efficiency.
  • High brightness: adopt high quality LED chip with 30mA current.
  • Power saving:70%
  • Special circuit design: each led works separately to avoid the situation when a single broken led affects the whole tube.
  • Adjustable: Latest lockable rotating end cap (patent).
  • Instant on: easy installation, no warm up time
  • Life cycle:50,000hrs
  • Warranty:5years
  • Low maintenance: robust construction.
  • Maintenance free
  • Environmental- friendly: no UV, no lead, no mercury, no Buzzing, no Flickering
  • No glass: Aluminum and + high strength PC cover, better heat dissipation
  • Safe: High Shock/Vibration Resistance, Single end power anti electric shock, Isolated power.
Application:
  • Ideal for refrigerator, Freezer, ATM, Lighting –Box, Subway, advertising boards
  • replacement for conventional fluorescent tubes.
Certification: TUV, UL,VDE, DLC
Specifications:
  • Light source:SMD3528LED
  • Luminous :2300+-10%(Clear Lens) Frosted lens
  • Voltage:  AC100-277V
  • Frequency:  50/60HZ
  • Power Factor: >0.93
  • Power  Efficiency: >0.87
  • THD:<20%
  • Operating  Temperature: -20°C to 40°C
  • Storage Temperature: -40°C to 85°C
  • Operating Humidity:10%-80%
  • Storage Humidity: 10%-80%
  • CRL: Ra: >80
  • CCT: Warm White 3000k , daylight white 4000k, pure white 5500k, cool white 6500k
  • Warranty:3years
  • Beam angle:240°
  • PC lens: frosted/clear.
Package:
  • Net weight: 368.2g.
  • Dimension: Φ26 x 1198 (5ft).
  • Packaging: 1pc/box, 50pcs/ctn.
  • Carton measurement: 135 x 48 x 26cm.
  • Pallet:14cartons/pallet
Payment: L/C, T/T.
Delivery:
  • 10 days for sample
  • 18 days for mass production.
  • MOQ:100pcs
Installation:
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • Electronic ballast must be by-passed by a registered electrician.
生產所需時間

20