Stair LED lighting
1340g
80.98mm*33.99mm
Clear, frosted and milky cover
GZ4
Heatsink
S002
LED Lighting
Is Alloy
可以
發光二極管照明
交流电
Surmountor
6063 Anodized Aluminum
China Aluminum Extrusion Stair Profile LED Up and Down Emitting - Features
Material: | Anodized Aluminum Extrusion |
Size: | 80.98W*33.99Hmm |
Match Flexible LED Strips: | For 10mm width LED strip; Up for 8mm |
Length: | 1meter, 2 meter or customized length |
PC Cover: | Milky/frosted/clear PC Cover |
UP Cover: | Anti-slip rubber (white/grey/black color) |
UL flammability of PC cover: | UL94V-2 |
Endcaps: | Plastic Endcaps |
Application: | Stair lighting for cinema, hotel, theatre, home, etc |
China Aluminum Extrusion Stair Profile LED Up and Down Emitting - Accessories
China Aluminum Extrusion Stair Profile LED Up and Down Emitting - Application
With 2 anti-slip rubbers upside, S002 stair aluminum profile is widely applied in cinema, theatre or night bar steps.
China Aluminum Extrusion Stair Profile RGB Up and Down Emitting - Installation by Screws
Package:
OPE/OPP bag + Protective materials + Carton (+ Optional Protectors):
1M per pcs, carton: 107*20*16cm
2M per pcs, carton: 207*20*16cm
Surmountor - A company you can trust!
Our company has specialized in LED for 11 years, with 9 engineers and over 100 employees.
We focus on developing LED flexible strips, LED sensor switches, LED Aluminum profiles for strips and LED Linear Lights.
With advanced automatic machines, experienced engineers and sales team, we keep providing high quality products, professional solutions, OEM and ODM as well as considerate aftersale services for our customers.
Q1: Can I have samples to test?
A: Yes, we're pleased to offer samples to check quality. Mixed sample order is available.
Q2: Is there any MOQ for the S002 stair aluminum profile?
A: MOQ is 100 meters.
Q3: What’s the lead time?
A: Sample: 3-5 working days. Mass production: 7-10 working days.
Q4: How do you ship the goods and how long does it take?
A: DHL, UPS, FedEx, TNT. Usually it takes 3-5 days to arrive.
By sea, shipping time is about 30-40 days.
Q5: Do you have you own factory?
A: Yes, we do have our own factory in Shenzhen. Welcome to visit. For 10 years, our company has specialized in LED profiles, LED strips, LED sensor switches, cabinet lights, LED RGB controllers and dimmers.
7-10 日