Factory 2 Wires Single Phase Spotlight Lighting Track Rail Copper Lamp Body for Shops and Hotels | Lights | Lighting Accessories & Parts
Factory 2 Wires Single Phase Spotlight Lighting Track Rail Copper Lamp Body for Shops and Hotels
Mainland China
Booth: 3E-E01 | Greenovation | Mainland China (Guangdong) - Lighting
Product Specification
Customised

Yes

Weight

0.42kg

Feature

2 Wires 1 Circuits lighting

Size

1000mm*32.3mm*20.3mm

Material

Aluminum,Plastic, Flat Copper

Brand

X-Track

Model No.

XR-L210-B

Technology

Coextrusion of copper plastic

Product Description

Single Circuit 2 Wires Surface Track XR-L210-B

1. 2 Wires Single Circuit system had advantages of stringent election material and fine workmanship.

2. High quality aluminium profiles ensure the strength of the tracks.

3. New plastic(PC) has excellent insulated properties which can sucessfully ensure safety.

4. Pure Copper conductive core ensures excellent conductive properties.

5. 2 Wires Surface Track is led SpotLight Rail System,it can connect multiple lamps and achieve 

    excellent lighting effects!

6. X-Track Technical Craft is Coextrusion of copper plastic,it has stability & durability.

 

Attention: 

1. The minimum order quantity only for reference,It will be production as your actual order!                         

2. FOB Shenzhen unit price only for reference (generally speaking,Unit Price as EXW Price)                                         

    FOB shenzhen Unit Price as  Actual cost (FOB Shenzhen) of Your order quantities)                                           

3. Welcome to Inquiry by email. 

                

2 Wires 1 Circuits  Surface Track 

XR-L210-B    Size: 1000mm*32.3mm*20.3mm

 



             
Model No.Surface Colour Package 
XR-L210-WWhite (RAL9003)20/Carton
XR-L210-BBlack  (RAL9004)20/Carton
XR-L210-GGrey   (RAL7040)20/Carton

 


Packaging & Shipping

 

Production Time: About 3-20days (as your order quantities)

Packing: 20pcs/Carton for XR-L210-B          

Shipping: by air (5-7days) or by sea (as your requirment)

 


 



Production Lead Time

5-20 days