Bulk RG59 Power Siamese Cable | ||||||||||
DESCRIPTION | ||||||||||
Outdoor CCTV Camera Installation Cable | ||||||||||
CABLE CONSTRUCTION | ||||||||||
RG59 Coaxial cable | ||||||||||
Conductor | Copper Clad Steel | 0.58+/-0,005 mm | ||||||||
Insulation | Solid PE | 3.70+/-0,10 mm | ||||||||
Shield | Copper braid 16 x 8x 0,12m | 95% | ||||||||
Sheath | PVC | 6.15+/-0,20 mm | ||||||||
Color | White | |||||||||
18AWG x 2C cable | ||||||||||
Conductor | Stranded bare copper | 32x0,20+/-0,005 mm | ||||||||
Insulation | PVC ( black/red) | 2.0+/-0,05 mm | ||||||||
Bending radius | ≥ 8 x Diameter (mm) Installation | |||||||||
Storage temperature | -15℃ + 70℃ |
ELECTRICAL SPECIFICATIONS | ||
Nominal Impedance | 75+/-3 | Ohm |
Capacitance approx | 52+/-3 | pF/m |
Velocity ratio | 85 | % |
Attenuation at 20°C MHz | dB/100 m | |||
50 | 8.1 | |||
100 | 11.5 | |||
200 | 16.8 | |||
400 | 23.5 | |||
600 | 30.3 | |||
800 | 35.8 | |||
860 | 36 | |||
1000 | 39.2 |
PACKING
305 m / wooden drum
305 m / plastic reel
500 m / wooden drum
All sizes and values without tolerances are reference values. We reserves the right to amend this specification without prior notice.
FAQ:
Q:How do you ensure cables quality?
A:Each cable undergoes physical testing in accordance with ISO/IEC 11801 and TIA-568-C.2 standards. Our team monitors every stage of production, with QC inspecting each step to ensure quality.
Q:Are you a manufacturer or trading company?
A:We are a factory.
Q:What is your delivery time?
A:Typically 5-10 days if in stock; 20-30 days for custom orders, depending on quantity.
Q:Do you have an MOQ?
A:Yes, normally 10 km per item.
Q:Do you provide samples? Are they free?
A:Yes, samples are free, but freight charges apply.
Q:How do I place an order for cables?
A:Share your requirements or application.→We provide a quote.→Confirm the sample and place a deposit.→We start production.
Q:Can I print my logo on the cables?
A:Yes, inform us before production.
Q:What are your payment terms?
A:Orders ≤ 60 km: 100% upfront.
Orders ≥ 60 km: 30% deposit, balance before shipment.
20 days