Bulk RG59 Power Siamese Cables | Consumer Electronics | Cables & Accessories
Bulk RG59 Power Siamese Cables
Mainland China
Booth: 3F-D16 | Electronic Accessories |
Product Specification
Product Description

Bulk RG59 Power Siamese Cable

Bulk RG59 Power Siamese Cable



DESCRIPTION
Outdoor CCTV Camera Installation Cable
CABLE CONSTRUCTION
RG59 Coaxial cable
ConductorCopper Clad Steel0.58+/-0,005 mm
InsulationSolid PE3.70+/-0,10 mm
ShieldCopper braid 16 x 8x 0,12m95%
SheathPVC6.15+/-0,20 mm
ColorWhite
18AWG x 2C cable
ConductorStranded bare copper32x0,20+/-0,005 mm
InsulationPVC ( black/red)2.0+/-0,05 mm
Bending radius≥ 8 x Diameter (mm) Installation

Storage temperature                               

 -15℃ + 70℃

 

 

ELECTRICAL SPECIFICATIONS
Nominal Impedance75+/-3Ohm
Capacitance approx52+/-3pF/m
Velocity ratio85%
Attenuation at 20°C  MHzdB/100 m
508.1
10011.5
20016.8
40023.5
60030.3
80035.8
86036
100039.2

PACKING

305 m / wooden drum

305 m / plastic reel

500 m / wooden drum

 

All sizes and values without tolerances are reference values. We reserves the right to amend this specification without prior notice. 

FAQ:

Q:How do you ensure cables quality?
A:Each cable undergoes physical testing in accordance with ISO/IEC 11801 and TIA-568-C.2 standards. Our team monitors every stage of production, with QC inspecting each step to ensure quality.

Q:Are you a manufacturer or trading company?
A:We are a factory.

Q:What is your delivery time?
A:Typically 5-10 days if in stock; 20-30 days for custom orders, depending on quantity.

Q:Do you have an MOQ?
A:Yes, normally 10 km per item.

Q:Do you provide samples? Are they free?
A:Yes, samples are free, but freight charges apply.

Q:How do I place an order for cables?
A:Share your requirements or application.→We provide a quote.→Confirm the sample and place a deposit.→We start production.

Q:Can I print my logo on the cables?
A:Yes, inform us before production.

Q:What are your payment terms?
A:Orders ≤ 60 km: 100% upfront.
Orders ≥ 60 km: 30% deposit, balance before shipment.

Production Lead Time

20 days